Registration is now open for one of the most popular professional events for engineering students. This year’s three-day Duna Group programme will feature Mohácsi Duna-híd, the latest technologies in the construction industry, as well as the group’s increasingly...
The Portfolio Csoport is organising the Future of Construction conference, at which the Magyar Építők will be present as a media partner and speaker. The event is the most important...
This year, 40 students had the chance to get a first-hand look at the day-to-day life of an infrastructure giant. The sixth DUNA GROUP Open University has come to an end.
The sixth Duna Group Szabadegyetem was launched. The engineering student participants were welcomed by Beatrix Szabó, President and CEO. She encouraged the young people to be the future developers of digitalisation in the construction industry.
Once again this year, university students will have the chance to experience the best of the Hungarian construction industry in a three-day programme.
The fifth Duna Group Szabadegyetem engineering students came home with a lot of interesting information, experience and good experiences.
The professional summer school for engineering students is becoming increasingly popular, with places filling up in just a few days this year.
The more than 250-year-old Tisza Castle was renovated in Geszten by WHB and Build It. The works have resulted in both technical and aesthetic renovation, as well as...
Students will also be able to visit the central asphalt laboratory and the M44 motorway.
This year, the quality and professionalism of Duna Group was even more evident, as evidenced by the feedback from students and universities alike.