Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The contractors for the Szolnok spa have brought a lawsuit against the city to secure payment of their final invoice

    • An exemplary model from Borsod – the synergy between father and son is driving Mento Csoportot forward

    • Class HE-DO brought the summer to a close with a family sports day

    • Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like

    • A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

  • Paks II
  • MKIF
  • What is being built?
    • It has great potential, yet it feels unwelcoming: more greenery would make Boráros Square a more liveable place

    • They are radically reducing the environmental impact and noise levels at Liszt Ferenc Airport

    • The ‘Mushroom’ will remain in Örs vezér Square – the detailed plans for the square’s regeneration may be finalised

    • A centre is being built for couples struggling with infertility under project Debreceni Egyetemen

    • New teaching facilities and a state-of-the-art hall of residence will now serve pupils in Nagykálló

  • Climate-X
    • A cooling vest, greener tarmac and digital work management: this is how the STRABAG is responding to climate change

    • The area around Malom Lake in Oroszlány has been revitalised with the addition of an owl castle and a viewing hill

    • This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

    • Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

    • Regionális Szárazgazdálkodási Együttműködés was founded in Debrecen

  • Bound track
    • From the tram tracks to the trees’ root zones: complex design work lays the foundations for the second phase of the Buda Interconnection project

    • Plans are in place for a new depot and track modernisation to accommodate the CAF trams

    • Alpine engineering techniques are also being used to protect the railway in the Danube Bend

    • This time, speed limits are being lifted on the Hatvan–Szolnok line

    • Test trains are rattling along the new Slovenian railway viaduct

  • Industry news
    • The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers

    • The road construction sector celebrated its half-century anniversary in Eger

    • Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

    • A space brimming with information and encounters – that’s what the Infotér CONTECH was like

    • Off to Lake Balaton – Contech for the third time!

  • Magyar Építők

Föld-út 99 Útépítő és Szolgáltató Kft.

  • Road building7 hours ago

    Good news for cyclists: a new route may be built on the Ráckeve cycle route

    For the time being, cyclists are using the existing public roads, as well as embankment paths and service roads.

More Posts
  • Latest
  • Popular
Road building2026. 11. 05.

Good news for cyclists: a new route may be built on the Ráckeve cycle route

What is being built?2026. 11. 05.

It has great potential, yet it feels unwelcoming: more greenery would make Boráros Square a more liveable place

Water management2026. 11. 04.

A comprehensive environmental assessment is being carried out to lay the foundations for the modernisation of the Royal Palace in Gödöllő

Water management2026. 11. 04.

Construction of the railway underpass on Tokaji út in Nyíregyháza may well be set to begin

Bound track2026. 10. 07.

Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line

Climate-X2026. 10. 07.

Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

Bound track2026. 10. 09.

The new section of the Buda interconnecting tram network could be built in three construction phases

Bound track2026. 10. 08.

Déli railway station is set to undergo a major refurbishment, paving the way for double-decker trains

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections - BC Zrt. - 5 November 2026.