Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The contractors for the Szolnok spa have brought a lawsuit against the city to secure payment of their final invoice

    • An exemplary model from Borsod – the synergy between father and son is driving Mento Csoportot forward

    • Class HE-DO brought the summer to a close with a family sports day

    • Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like

    • A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

  • Paks II
  • MKIF
  • What is being built?
    • An arena powered exclusively by green energy is set to be built in Romania: construction of the stadium is already underway

    • The expansion joints on the Buda side of the Erzsébet Bridge were installed overnight

    • Industrial investment is set to boost fruit production in the Nyírség region

    • Renovation work is set to begin on dozens of public buildings in Terézváros

    • The new industrial production hall could boost economic development in Matyóföld

  • Climate-X
    • This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

    • Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

    • Regionális Szárazgazdálkodási Együttműködés was founded in Debrecen

    • The first municipal thermal power station in Transylvania is under construction

    • From the heating plant to the library – solar panels are to be installed on eight local authority buildings in Kiskunfélegyháza

  • Bound track
    • Alpine engineering techniques are also being used to protect the railway in the Danube Bend

    • This time, speed limits are being lifted on the Hatvan–Szolnok line

    • Test trains are rattling along the new Slovenian railway viaduct

    • Nearly 880 tonnes of crushed stone are being moved on the 1-es vasútvonalon – track conditions are improving over a 600-metre stretch

    • Railway development is coming to the Hungarian Puszta too: Hortobágy station is being refurbished with an accessible platform and track works

  • Industry news
    • The road construction sector celebrated its half-century anniversary in Eger

    • Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

    • A space brimming with information and encounters – that’s what the Infotér CONTECH was like

    • Off to Lake Balaton – Contech for the third time!

    • The refurbishment of Citadella has won an international award – 14,000 square metres of historic stonework have been restored

  • Magyar Építők

SZI-ZA Kft.

  • What is being built?5 months ago

    A new beach is being built at Tolna’s largest natural bathing spot

    Faddi Beach, situated next to the Danube backwater, is set to be developed with a new kiosk and landscape features. Work on projects SZI-ZA Kft. and Geotechnika '84 Kft. is due to begin in the coming days.

More Posts
  • Latest
  • Popular
Road building2026. 10. 22.

One of Abony’s most important transport routes is to be redesigned

Climate-X2026. 10. 22.

This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

Water management2026. 10. 22.

Order has been restored: production of the new Közlekedési Múzeum can now go ahead as originally planned

Water management2026. 10. 21.

We took a look at how the refurbished Igazságügyi palota building turned out

What is being built?2026. 09. 23.

Another block of flats could be extended by two storeys in the Ferencváros regeneration area

Climate-X2026. 09. 26.

The first municipal thermal power station in Transylvania is under construction

Bound track2026. 09. 24.

Major renovation work is set to begin on the Buda section of tram line 6

What is being built?2026. 09. 28.

A project on a scale not seen for decades is set to begin on Verseny Street

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections – BC Zrt. – 22 October 2026.