Road building

Railway bridge or underpass to be built at the southern border of the Budapest-Belgrade railway line

Published

The public procurement for the design of a separate level crossing of the Kelebia-Baja main road crossing the railway has been published.

The railway crossing in the southern border town of Kelebia will be replaced by a separate level crossing. The village is crossed by the nearly 70-kilometre-long Kelebia-Baja main road 5501, which will be the crossing point of the Budapest-Belgrade railway line, and the upgrade is expected to bring much more traffic through the village.

A tender has now been issued for the design of a separate level crossing on the TED : the task is to prepare the junction plans at the study, approval and implementation plan levels.

Study plan to consider whether the railway crossing should be made with an underpass or overpass.

The task is also to

  • obtaining full approval for the selected structure, and consent from all stakeholders,
  • preparation of construction plans and tender design documentation for the subsequent construction,
  • the preparation of independent statics,
  • checking the conformity of the municipalities concerned with the land-use planning instruments and, if necessary, initiating their amendment,
  • participation in the modification and the delivery of the double-clause expropriation plans required for the expropriation procedure.

Source : Link

Popular