Road building
Another road reconstruction in Nógrád - this time on the southern border of the county
We recently reported on a series of road renovation projects affecting six settlements in Nógrád County, which are being implemented by HE-DO on behalf of Magyar Közút Nzrt..
In recent days, news has arrived once again from the northern Hungarian county about the renovation of another road not included in the previous package: nool.hu reports in an article about, among other things, a Facebook video by Zsolt Becsó, a member of the National Assembly, which reveals that,
The Apc-Szarvasgede link road 2131 will be reconstructed with funds from the Hungarian Village Programme.
As you can see from the video and the article, the modernisation will cover a length of 1122 metres on the Nógrád section of the road, which also passes through Heves county. In addition to the complete replacement of the pavement, the works are expected to reinforce the drainage and the road surface to ensure a long-lasting result.
Source : Link
-
Current at 2026. 09. 09.
A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
-
Bound track 2026. 09. 15.
Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues
-
Climate-X 2026. 09. 09.
Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof
-
Current at 2026. 09. 09.
Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage