Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The contractors for the Szolnok spa have brought a lawsuit against the city to secure payment of their final invoice

    • An exemplary model from Borsod – the synergy between father and son is driving Mento Csoportot forward

    • Class HE-DO brought the summer to a close with a family sports day

    • Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like

    • A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

  • Paks II
  • MKIF
  • What is being built?
    • New teaching facilities and a state-of-the-art hall of residence will now serve pupils in Nagykálló

    • One of Hungary’s largest spas is breaking away from the design style of the 1970s

    • More secrets have recently been uncovered about the Szent Jakab-templom in Kőszeg, and its façade is now set to be refurbished

    • Another hospital development project is set to begin in Szentes; this time, the musculoskeletal rehabilitation ward is to be expanded

    • Many people from the capital are also choosing it as their new home: four buildings are being constructed in Gárdony using a special foundation system

  • Climate-X
    • This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

    • Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

    • Regionális Szárazgazdálkodási Együttműködés was founded in Debrecen

    • The first municipal thermal power station in Transylvania is under construction

    • From the heating plant to the library – solar panels are to be installed on eight local authority buildings in Kiskunfélegyháza

  • Bound track
    • Plans are in place for a new depot and track modernisation to accommodate the CAF trams

    • Alpine engineering techniques are also being used to protect the railway in the Danube Bend

    • This time, speed limits are being lifted on the Hatvan–Szolnok line

    • Test trains are rattling along the new Slovenian railway viaduct

    • Nearly 880 tonnes of crushed stone are being moved on the 1-es vasútvonalon – track conditions are improving over a 600-metre stretch

  • Industry news
    • The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers

    • The road construction sector celebrated its half-century anniversary in Eger

    • Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

    • A space brimming with information and encounters – that’s what the Infotér CONTECH was like

    • Off to Lake Balaton – Contech for the third time!

  • Magyar Építők

CAF tram

  • Bound track3 minutes ago

    Plans are in place for a new depot and track modernisation to accommodate the CAF trams

    The public procurement process has been completed. Preparations can now begin for the modernisation of tram line 14 and the development of the Angyalföld depot, so that they can accommodate the new vehicles for the capital’s fixed-track transport system.

More Posts
  • Latest
  • Popular
Water management2026. 10. 30.

Mester Street is being redeveloped in a confined space alongside tram traffic

Bound track2026. 10. 30.

Plans are in place for a new depot and track modernisation to accommodate the CAF trams

Water management2026. 10. 30.

We do need a pump after all! – How does the BIM pay for itself in industrial investments?

Water management2026. 10. 30.

The government wants 10-year development cycles for the construction sector

Water management2026. 10. 02.

Hungary has joined the single electricity market

What is being built?2026. 10. 01.

A mental fitness course, a fire station, an eight-metre-high green wall – this is what the new NKE building looks like

Water management2026. 10. 01.

A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises

What is being built?2026. 10. 03.

Four blocks, 254 flats: structural work on the Csepel apartment block is progressing using PERI systems

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections – BC Zrt. – 30 October 2026.