Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The contractors for the Szolnok spa have brought a lawsuit against the city to secure payment of their final invoice

    • An exemplary model from Borsod – the synergy between father and son is driving Mento Csoportot forward

    • Class HE-DO brought the summer to a close with a family sports day

    • Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like

    • A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

  • Paks II
  • MKIF
  • What is being built?
    • New teaching facilities and a state-of-the-art hall of residence will now serve pupils in Nagykálló

    • One of Hungary’s largest spas is breaking away from the design style of the 1970s

    • More secrets have recently been uncovered about the Szent Jakab-templom in Kőszeg, and its façade is now set to be refurbished

    • Another hospital development project is set to begin in Szentes; this time, the musculoskeletal rehabilitation ward is to be expanded

    • Many people from the capital are also choosing it as their new home: four buildings are being constructed in Gárdony using a special foundation system

  • Climate-X
    • This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

    • Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

    • Regionális Szárazgazdálkodási Együttműködés was founded in Debrecen

    • The first municipal thermal power station in Transylvania is under construction

    • From the heating plant to the library – solar panels are to be installed on eight local authority buildings in Kiskunfélegyháza

  • Bound track
    • Plans are in place for a new depot and track modernisation to accommodate the CAF trams

    • Alpine engineering techniques are also being used to protect the railway in the Danube Bend

    • This time, speed limits are being lifted on the Hatvan–Szolnok line

    • Test trains are rattling along the new Slovenian railway viaduct

    • Nearly 880 tonnes of crushed stone are being moved on the 1-es vasútvonalon – track conditions are improving over a 600-metre stretch

  • Industry news
    • The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers

    • The road construction sector celebrated its half-century anniversary in Eger

    • Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

    • A space brimming with information and encounters – that’s what the Infotér CONTECH was like

    • Off to Lake Balaton – Contech for the third time!

  • Magyar Építők

Országos Magyar Épületgépész Napok

  • Water management3 minutes ago

    We do need a pump after all! – How does the BIM pay for itself in industrial investments?

    This event, which promises to be fascinating, will examine – through real-life project scenarios – where an effective flow of information and sectoral coordination deliver genuine value for the investor, the designer and the...

More Posts
  • Latest
  • Popular
Water management2026. 10. 30.

Mester Street is being redeveloped in a confined space alongside tram traffic

Bound track2026. 10. 30.

Plans are in place for a new depot and track modernisation to accommodate the CAF trams

Water management2026. 10. 30.

We do need a pump after all! – How does the BIM pay for itself in industrial investments?

Water management2026. 10. 30.

The government wants 10-year development cycles for the construction sector

Water management2026. 10. 02.

Hungary has joined the single electricity market

What is being built?2026. 10. 01.

A mental fitness course, a fire station, an eight-metre-high green wall – this is what the new NKE building looks like

Water management2026. 10. 01.

A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises

What is being built?2026. 10. 03.

Four blocks, 254 flats: structural work on the Csepel apartment block is progressing using PERI systems

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections – BC Zrt. – 30 October 2026.