Road building

Here is the list of the Magyar Közút of the renewable roads in Komárom-Esztergom county

Published

Photos:Illustration/archive/Nagy Mihály/magyarepitok.hu
Nine road sections have been listed, including the main road through the Dorog area, which will be resurfaced.

We have written about the renovation of the road network in several counties and regions in recent weeks. In some cases, we have mentioned individual roads (such as the connecting road linking the villages of Göcsej ), and summarising data for an entire region (such as the recent press conference on the renovation of roads in Somogy County).

These projects are being implemented as part of the Magyar Közút Nzrt. investment. Now, in response to an enquiry from kemma.hu , the state road management authority has published a new list. Nine road sections have been listed, which will be renovated in Komárom-Esztergom, divided into three areas, affecting more than 25 kilometres of road.

They work on these roads

Esztergom and its surroundings:

  • Highway 11 52+863-53+750 km (inside Pilismarót)
  • Main road 111 6+500-7+550 km (in the Dorog area)
  • 1121 Tokod-Dag link road 6+000-7+680 km (in the Sárisáp area)
  • 11136 Dunaszentmiklós access road 0+000-3+400 km and 3+400-6+210 km (section between Szomód and Dunaszentmiklós)
  • 11125 Piliscsév access road 1+840-3+967 km (in the area of Piliscsév)
  • 1122 Bajna-Máriahalom link road 2+120-2+895 km (inside Epöl)

After the current road rehabilitation in the Esztergom region, only one, but longer road section was mentioned in the Tata region , the Hántai access road 82116, km 0+000-4+522 (Hántai section, large surface repair). In the area of Comar, two roads were also mentioned, covering a longer distance: the Bana access road 81141, 0+000-5+301 km (Ács, Bana outskirts and Bana interior, with cycling facilities) and the Ács-Bábolna link road 8151, 3+786-9+200 km (Ács-Bábolna exterior, in several phases).

Source : Link

Popular